Login
Gallery Airplane stuff Challenger II Construction Tail Build

Tail Build

Date: 01/10/2006
Owner: Curt Watkins
Size: 18 items
nextlast
I find the center line by marking the tube with marker and running a square along the edge.

I find the center line by marking the tube with marker and running a square along the edge.

Date: 04/01/2005
Views: 274
I line the center of the holes up with the center line. Then I clamp with hose clamps.

I line the center of the holes up with the center line. Then I clamp with hose clamps.

Date: 04/01/2005
Views: 232
then I drill the hole for the 3/16 rivet. (alum)

then I drill the hole for the 3/16 rivet. (alum)

Date: 04/01/2005
Views: 218
I use un-popped rivets to help keep things lined up.

I use un-popped rivets to help keep things lined up.

Date: 04/01/2005
Views: 220
Just me workin.

Just me workin.

Date: 04/01/2005
Views: 205
th6.jpg
Date: 04/01/2005
Views: 241
For prebuilding the tail I went ahead and poped one rivet in the center hole of each L-bracket. (or you could get a lot of hose

For prebuilding the tail I went ahead and poped one rivet in the center hole of each L-bracket. (or you could get a lot of hose

Date: 04/01/2005
Views: 209
6 hinges total for the elavators

6 hinges total for the elavators

Date: 07/16/2005
Views: 292
th9.jpg
Date: 07/16/2005
Views: 239
nextlast
Page: 1 2
Powered by Gallery v2.2